background image

 

 

13

 

Summary of Contents for Air Boss T5200

Page 1: ...s T Series Model T5200 INSTALLATION OPERATION SERVICE Electrostatic Precipitator for Industrial Applications 101 McNeill Road Sanford NC 27330 919 775 2201 Fax 919 777 6399 800 884 0002 www trioninc c...

Page 2: ...ing Collecting Cells 6 Inspections 6 V Replacement Parts Ordering Information 6 VI Warranty 6 VII Troubleshooting Guide 7 Troubleshooting Diagram 8 VIII Diagrams Exploded View Figures Figure 1 T5200 U...

Page 3: ......

Page 4: ...hung Eyebolts can be supplied by Trion NEW UNIT INSPECTION Immediately upon receiving the unit carefully examine the package for damage during transit If the unit is damaged contact the last carrier...

Page 5: ...ly distributed across the entire face area of the unit The prefilters provide some resistance to effect even air distribution However since most air ducts are designed to handle air velocities greater...

Page 6: ...n completed assure that the equipment is ready for start up by checking the following A All construction debris is removed from the ionizing collecting cells drain connections and ductwork B The drain...

Page 7: ...of Material for the Model T 5200 Use these pages to determine the part numbers of the items needed To order parts contact your local Trion representative and provide the following information a Unit...

Page 8: ...rdering Information for replacement parts Before performing any troubleshooting ensure the correct input line voltage is present VII TROUBLESHOOTING GUIDE IF PROBLEM CANNOT BE DETERMINED OR CORRECTED...

Page 9: ...7 8...

Page 10: ...9...

Page 11: ...10...

Page 12: ...11...

Page 13: ...12...

Page 14: ...13...

Page 15: ...14...

Page 16: ...15...

Page 17: ...on GmbH Fedders International Boscstr 60 No 728 Fuzhou Road D 50171 Kerpen Rm 3002 3005 Germany Raffles City Office Tower Tel 49 0 2237 922 103 Shanghai P R China 200001 Fax 49 0 2237 922 104 Tel 86 2...

Reviews: