“LIVELINK INSTALL” APP / WHAT IS A USE CASE? / PRIVATE USE CASES
Page 26 / 77
Use Case “Corridor”
In the Use Case “Corridor”, the luminaire group “Corridor” is applied.
In addition, there are three sensors that are responsible for daylight-
dependent light control as well as presence detection. Sensor 1-3
control the presence detection, sensor 1 the daylight-dependent control.
In addition to the application specific Use Cases (public & private), the
public Use Case “Universal” is also available.
In the Use Case “Universal”, nine freely assignable luminaire groups
“G1-G9” are applied. In addition, there are nine freely assignable
sensor spots that are responsible for daylight-dependent light control
as well as presence detection.
Presetting of the luminaire groups
Group of luminaires
Function
Corridor
• Presence detection
• Daylight-dependent control
Presets of the scenes
Scene
Function
Automatic
• 5 minutes switch-off delay,
fully automatic operation
• Daylight-dependent control active
(via sensor 1)
Service
• Constant dimming level for all groups
at 100 %
• 10 minutes switch-off delay
Night lighting
• Constant dimming level
for all groups at 20 %
• no automatic switch-off
Off
• All groups off
Presets of the scenes
Scene
Function
ON
• All groups at 100 %
OFF
• All groups off
Additional scenes must be mandatorily created manually.
UNIVERSAL USE CASE
PRIVATE USE CASES
Project-related, Use Cases are always created in cooperation with the
TRILUX light planners.
The finished Use Cases are then made available in the customer account
of the myTRILUX portal (see chapter “Administrating Use Cases”).
Work
Additional
Meeting
S1
Additional
Work 3
Work 1
Work 4
Work 2
S1
S3
S2
S4
Additional
Meeting
Presentation
S1
Traffic route
Work 1
Work 3
Work 2
SV1
SA1
SV2
SA2
SV3
SA3
Traffic route 1
Traffic route 2
Work 1
Work 4
Work 3
Work 6
Work 2
Work 5
SV1
SV4
SA1
SA4
SV2
SV5
SA2
SA5
SV3
SV6
SA3
SA6
Corridor (+ Centre)
Window
Boa
rd
S1
S2
Hall
S1
S2
Accent
Shop Wind
ow
Cash Regi
st
er
Shop
S1
S2
S3
Bed 3
Bed 2
Bed 1
Tab
le
Room
S1
S2
Bathroom
Corridor
S1
S2
S3
G3
G6
G9
G2
G5
G8
G1
G4
G7
S1
S4
S7
S2
S5
S8
S3
S6
S9
Work
Additional
Meeting
S1
Additional
Work 3
Work 1
Work 4
Work 2
S1
S3
S2
S4
Additional
Meeting
Presentation
S1
Traffic route
Work 1
Work 3
Work 2
SV1
SA1
SV2
SA2
SV3
SA3
Traffic route 1
Traffic route 2
Work 1
Work 4
Work 3
Work 6
Work 2
Work 5
SV1
SV4
SA1
SA4
SV2
SV5
SA2
SA5
SV3
SV6
SA3
SA6
Corridor (+ Centre)
Window
Boa
rd
S1
S2
Hall
S1
S2
Accent
Shop Wind
ow
Cash Regi
st
er
Shop
S1
S2
S3
Bed 3
Bed 2
Bed 1
Tab
le
Room
S1
S2
Bathroom
Corridor
S1
S2
S3
G3
G6
G9
G2
G5
G8
G1
G4
G7
S1
S4
S7
S2
S5
S8
S3
S6
S9
Summary of Contents for LiveLink
Page 1: ...LIVELINK SYSTEM MANUAL ...
Page 76: ...FAQ Page 76 77 ...