FOR INFLATION
• The entire frame is inflated through a single
valve.
• On the pump (1) : Connect the inflation tube
• On the valve (2) : Remove the valve cap (A), fit
the appropriate valve adapter to the end of the
inflation tube (B) and connect it to the valve.
You can now start inflating the arches by perfor-
ming regular pumping movements.
Once the pole is inflated to the correct pressure,
remove the tube (B) end and refit the valve cap (A).
TO DEFLATE
• Simply unscrew the caps of the 2 valves to
deflate (C).
Inflate each pole to:
0.344 BARS / 5 PSI.
DO NOT INFLATE ABOVE
THESE VALUES AS THIS
MAY RESULT IN THE POLES
BURSTING.
ENGLISH
- 15 -
- 14 -
2
3
A
B
C
1
Notice NORTH-TWIN.indd 15
04/10/2019 12:19
Summary of Contents for AUVENT NORTH-TWIN
Page 8: ...FRANÇAIS 8 Notice NORTH TWIN indd 8 04 10 2019 12 19 ...
Page 18: ... 18 ENGLISH Notice NORTH TWIN indd 18 04 10 2019 12 19 ...
Page 20: ...NOTES 20 ENGLISH B Notice NORTH TWIN indd 20 04 10 2019 12 19 ...
Page 28: ...DEUTSCH 28 Notice NORTH TWIN indd 28 04 10 2019 12 19 ...
Page 31: ...NOTIZEN DEUTSCH 31 Notice NORTH TWIN indd 31 04 10 2019 12 19 ...
Page 32: ...NOTIZEN DEUTSCH 32 Notice NORTH TWIN indd 32 04 10 2019 12 19 ...