15
4
Using a 50mm hole saw, drill the inlet
hole and the required number of outlet
holes. The inlet hole/outlet holes can be
positioned at alternative locations
around the bottom of the distribution box
to suit the site conditions.
5
Place the indexing valve into the
distribution box, connect the outlet pipes
(to Puraflo modules) and inlet pipe (from
the pump chamber) to the indexing valve.
6
Secure distribution box riser in place
using six 25mm pan screws.
7
Position the indexing valve as close to the
Puraflo modules as site conditions allow.