background image

 

 

- 3 - 

CGSD 162 

s

afety

 

regulations

  •  The standards IEC/EN/DIN EN 50083 resp. IEC/EN/DIN EN 60728 must 

be observed.

 

•  Do not perform installation and service work during thunderstorms.

 

•  Assembly,  installation  and  servicing  should  be  carried  out  by  authorised 

electricians.

 

•  Switch off the operating voltage of the system before beginning with assem-

bly or service work.

 

•  Avoid short circuits! 

 

•  Observe the relevant standards, regulations and guidelines on the installa-

tion and operation of antenna systems. 

 

•  To ensure electromagnetic compatibility, make sure all connections are tight 

and the covers are screwed on securely.

 

•  No liability is accepted for damage caused by faulty connections or inap-

propriate handling of the device.

  Check  the  head-end  station

 

CSE  2800

  a

ccording  to  the  safety  instructions 

listed in their assembly instruction.

  Take precautions to prevent static discharge when working on the device!

  Electronic devices should never be disposed of in the household rubbish. In 

accordance with directive 2002/96/EC of the European Parliament and the 
European Council from January 27, 2003 which addresses old electronic and 
electrical devices, such devices must be disposed of at a designated collection 
facility. At the end of its service life, please take your device to one of these 
public collection facilities for proper disposal.

g

eneral

 

information

2.1  s

Cope

 

of

 

delivery

SAT IF input distributor CGSD 162

SAT cables

CD (assembly instructions)

Brief Assembly Instructions

 

Mounting material

Summary of Contents for CGSD 162

Page 1: ...Assembly Instruction CGSD 162 Model Item no CGSD 162 325033 Version B Date 04 2016 EN ...

Page 2: ...bols used 4 2 3 Technical data 4 2 4 Description 4 3 Overview 5 4 Installing the SAT IF input distributor 6 5 Connecting the SAT IF input distributor 7 5 1 Connecting the HF connections 7 Using one reception area loop through mode 7 Using two reception areas 7 5 2 Connecting the power supply 8 6 Final procedures 9 ...

Page 3: ...d by faulty connections or inap propriate handling of the device Check the head end station CSE 2800 according to the safety instructions listed in their assembly instruction Take precautions to prevent static discharge when working on the device Electronic devices should never be disposed of in the household rubbish In accordance with directive 2002 96 EC of the European Parliament and the Europe...

Page 4: ... outputs 6 4 F sockets Input output impedance 75 Ω Decoupling of the outputs 20 dB Loss 1 6 fold see page 5 9 14 dB Loop through loss 8 dB Loss 1 4 fold see page 5 9 12 dB LNB operating voltage supply via external connector max 800 mA 2 4 Description The SAT IF distributor CGSD 162 is equipped with two SAT IF inputs one loop through output and 10 SAT IF outputs This enables to distribute two recep...

Page 5: ... mA is used for the power supply of the LNBs connected The SAT IF distributor CGSD 162 is designed exclusively for use in the CSE 2800 head end station 3 Over view E A B D C F 9 12 dB 9 14 dB 8 dB A LNB power connection D Input 1 B Input 2 E Outputs of input 1 C Loop through output of F Outputs of input 2 input 1 with terminator ...

Page 6: ...ve the front cover and the base plate of the CSE 2800 head end sta tion Insert the SAT IF input distributor 1 above the output collector 2 so that the LNB power connection A is facing the control panel 1 A 2 Fasten the outer sockets of the SAT IF input distributor 3 with two nuts and lock washers put under each 3 3 Tighten the nuts until the teeth on the lock washers have penetrated the exte rior ...

Page 7: ...nals 4 in the rear wall of the head end station using a HF cable made on site length approx 30 cm Connect the loop through output C to input B using a HF cable made on site length approx 30 cm 4 D C B Using two reception areas Connect inputs B and D of the SAT IF input distributor to the appropriate pre installed F terminals 4 in the rear wall of the head end station using HF cables made on site l...

Page 8: ... 8 CGSD 162 5 2 Connecting the power supply Connect plug 6 of the cable of the LNB power connection A to one of the contacts LNB power supply 800 mA total LNB power supply 6 A ...

Page 9: ...curely tighten the cable connections F connector using an open ended spanner spanner gap 11 mm Programme the modules connected and the head end station if necessary Position the breakthroughs in the base plate above the fastening screws 2 Push the base plate in direction of the arrow and lock it with the locking screw 1 Tighten the fastening screws 2 1 2 2 2 Tighten the nuts of retrofitted F termi...

Page 10: ...RIAX Multimedia are registered trademarks or trademarks of the TRIAX Company or its affiliates All specifications in this guide are subject to change without further notice TRIAX A S Bjørnkærvej 3 DK 8783 Hornsyld Denmark For further information and updated manuals go to ...

Reviews: