Mounting and Wiring AM-4 Module

Electrical Shock Hazard.  Turn off the power

to the boiler before proceeding with the

installation of the AM-4 module.  Failure to

comply could result in severe personal injury,

death, or substantial property damage.

1. Remove the front panel of the Prestige by

removing the mounting screws along the upper
edge of the unit.  Lift the panel up and pull for-
ward to remove the front panel from the unit.

2. Remove the screw retaining the control panel.

Open the display panel cover and swing the
control panel out.

3. Insert a small flat-blade screwdriver into slot on

the bottom of the AM-4 module near the tapered
end of the module and gently pry off the cover.
Use care not to damage the cover or the module.

4. With the AM-4 cover removed and facing the

electronics orient the AM4 with the ribbon
cable connection toward the top. Insert the rib-
bon cable according to the keyed connector and
the red strip on the right.  Route the ribbon cable
through the top cutout of the control cover.

5. Route the wires from the Multiple Boiler

Controller 0 –10v terminals and any optional
alarm wires through the wire ways of the
Prestige boiler and along the Prestige factory
wiring.  Strip the wire ends and connect to the
AM-4 terminals X2-1 and X2-2 for the 0-10 vdc
analog signal and X1-1 and X1-2 for the alarm
as shown in Figure 1.  Use the cable clamps pro-
vided in the AM-4 kit to secure the incoming
wires to the module.

Ensure the polarity of the wire connections

from the Boiler Controller to the AM-4 is

maintained as shown in Figure 1.  Failure to

maintain polarity will cause the AM-4 to

receive erratic and/or no signal from the

Boiler Controller

6. Snap the cover back on the AM-4 module.

7. Place the AM-4 on the backside of the control

panel as shown in Figure 2 on page 3.  Align the
mounting holes of the AM-4 with upper or lower
clearance holes along the hinged side of the con-
trol panel.  Secure the AM-4 module using the
two screws provided in the AM-4 kit, from the
front of the control panel as shown in Figure 2 on
page 3.

8. Insert the ribbon cable according to the keyed con-

nector into the empty socket of the Prestige MCBA
control module. The red strip on the ribbon cable
should be positioned toward the top or left side
depending upon MCBA control orientation.

NOTICE

WARNING

Alarm

Connection

Ribbon Cable

Plug

0-10 VDC

(-) Connection

X2-2

0-10 VDC

(+) Connection

X2-1

Fig. 1:  AM-4 Interface Module Wire

Connection

Summary of Contents for PSRKIT23

Page 1: ...uipment but not related to personal injury hazards NOTICE WARNING Failure to follow instructions below can result in severe personal injury or damage if ignored Instructions are for a qualified installer service technician Read all instructions before proceeding Follow instructions in the proper order For your safety turn off electrical power supply at service panel and allow unit to cool before p...

Page 2: ...wires through the wire ways of the Prestige boiler and along the Prestige factory wiring Strip the wire ends and connect to the AM 4 terminals X2 1 and X2 2 for the 0 10 vdc analog signal and X1 1 and X1 2 for the alarm as shown in Figure 1 Use the cable clamps pro vided in the AM 4 kit to secure the incoming wires to the module Ensure the polarity of the wire connections from the Boiler Controlle...

Page 3: ...ule operational parameter settings reference the Prestige Control Supplement Program Access To enter the parameter listing of the MCBA control the installer must enter the activation code as fol lows 1 Press and hold the MODE button 2 Continue holding the MODE and press STEP button until STBY appears and hold both STEP and MODE buttons for 2 to 3 seconds The display should read CODE 3 Release the ...

Page 4: ...hange the value of the display Press the STORE button once to save the change If a parameter setting is changed from the factory default and the STORE button is not pressed to save the setting the MCBA mod ule will automatically store the setting after 15 minutes Ensure all parameters settings are either factory default or revised based on the application Review all parameters set tings on page 10...

Page 5: ...ing listed below and press STORE to save the set ting Test Verify Boiler and Control Operation 1 Refer to and follow the instructions given in the Prestige Installation manual to test operation of the boiler and the MCBA control To initiate any calls for heat during the test you will have to operate the external boiler controller 2 Verify the boiler modulates correctly by adjust ing the external b...

Page 6: ... to use the wire tool to remove the jumper from the terminal block 2 Restore power to the boiler initiate a demand and allow the boiler to proceed through its start up sequence 3 The Prestige MCBA control module should enter a hard lockout causing the alarm contacts on the AM 4 to close The remote alarm should then be activated 4 Disconnect the power supplied to the boiler and replace the jumper a...

Reviews: