![TriangleTube Delta Installation And Maintenance Manual Download Page 13](http://html.mh-extra.com/html/triangletube/delta/delta_installation-and-maintenance-manual_1160052013.webp)
Appliance Preparation
7
SECTION II - Appliance Preparation
Handling Instructions
The MODULATING DELTA is generally easi-
er to handle and maneuver once removed from
the shipping carton and pallet.
To remove the shipping carton and pallet:
a. Remove the shipping straps and open
the top of the carton to remove the
wood shipment insert.
b. Lift the carton over the appliance to
remove. If ceiling height is limited, the
carton maybe cut open using care not to
damage the exterior jacket of the appli-
ance.
c. Remove the front burner hood to pre-
vent damage prior to lifting the appli-
ance from the shipping pallet.
When lifting or moving the appliance do
not use the burner or its components as a
means of a handle. Hand-truck the
appliance from the rear only.
d.
Discard all packing materials.
WARNING