Triacta Power Technologies PowerHawk 6320
4
Installation
Installation
This section provides pre-installation, installation and system start-up procedures as follows:
•
“Pre-installation” on page 4
•
“Installation procedures” on page 6
•
“Start-up sequence for the PowerHawk 6320 meter” on page 17
Pre-installation
This section provides information about activities that must be performed before installing the
equipment at the site. The following topics are covered:
•
“Pre-installation check list” on page 4
•
“Site planning” on page 5
Pre-installation check list
The following Triacta Power equipment is required for each installation:
•
PowerHawk 6320 high-density meters
•
two 25-pair CT cables per PowerHawk meter with amphenol connectors, available in
lengths of 13 ft. (4 m) or 26 ft. (8 m)
•
serialized current transformers for metering
Note:
The current transformers supplied by Triacta are certified, and comply with national
electrical codes.
When you receive your order, verify that the items listed above are included with the shipment,
and visually inspect them for damage. If any parts are missing or damaged, contact your Triacta
representative.