NOT
FO
R DI
ST
RIBUTIO
N
W
ITHO
U
T T
H
E
CON
S
ENT
OF
TRIACTA PO
WER
Triacta Power Technologies PowerHawk 6320
Index
25
Index
120 V/240 V
install reference voltage cable and power cable,
8
5A CT converters
installing, 14
A
audience, 1
C
certification
safety, 23
compliance
electrical safety, 23
regulatory, 22
Connecting, 16
current probes
PowerHawk, 3
current transformers
installing, 12
D
dimensions
PowerHawk, 3
E
electrical safety compliance, 23
equipment servicing, 23
Ethernet cable
connecting, 16
F
fuse rating
PowerHawk, 3
I
initial report
force, 17
Installation, 3
installation, 4
current transformers, 12
installation procedures
overview, 6
M
maximum altitude
PowerHawk, 3
maximum current
PowerHawk, 3
Measurement, 3
measurement accuracy
PowerHawk, 3
measurement category
PowerHawk, 3
meter map
recording, 20
N
NVM storage
PowerHawk, 3
O
onboard Ethernet port
PowerHawk, 3
onboard modem
PowerHawk, 3
operating humidity
PowerHawk, 3
operating temperature
PowerHawk, 3
P
pollution degree
PowerHawk, 3
PowerHawk
current probes, 3
dimensions, 3
fuse rating, 3
installation in a single--phase panel, 9
installation in a three-phase wye panel, 10
maximum altitude, 3
maximum current, 3
measurement accuracy, 3
measurement category, 3
mounting, 6
NVM storage, 3
onboard Ethernet port, 3
onboard modem, 3
operating humidity, 3
operating temperature, 3
pollution degree, 3
reference input voltage, 3
specifications, 3
system description, 1
usage environment, 3
voltage tolerance, 3
weight, 3
pre-installation, 4
Summary of Contents for PowerHawk 6320
Page 1: ...PowerHawk 6320 High Density Meter Installation Guide...
Page 31: ......