- 23 -
Tri-Tech
Medical Inc.
Alarm Installation
You are now ready to supply power to the
alarm. The toggle switch on the front of the
power supply should be placed in the ON
position.
Check the green power LED indicator on the
front of the CPU module. It should be
illuminated.
You are now ready to press
system to normal operating
alarm is shown here with O
normal operating pressures