![Trend Sports EUROBUNGY Standard Operating Procedure Download Page 37](http://html1.mh-extra.com/html/trend-sports/eurobungy/eurobungy_standard-operating-procedure_1155785037.webp)
Standard Operating Procedure
Attraction: EUROBUNGY-TRAMPOLINE
August
2011
Policy: Standard Operating Procedures Manual
Approved: Peter Raidt
Page 37 of 39
Appendix A
Elastic Log
EUROBUNGY-TRAMPOLINE
POWERCORD/LOOP (ELASTICS) LOG
INSTALLED
RETIRED
INSTALL
DATE
10lbs
20lbs
30lbs
RETIRE
DATE
10lbs
20lbs
30lbs
The elastics should be replaced regularly for optimal use and safety. If at anytime the interior cords
are visible through the protective sheath of the Powercord the cord must be retired.
Should the elastics get wet, dry them completely before using them again.