Installation
(for qualified installers only)
7
© Travis Industries
10/16/17 - 1453
PB 42 MV/GSB2 Install
Packing List
LP (Propane) Conversion Kit - Burner Orifice (1.45mm), Pilot Orifice (0.14 LP), LP Regulator
Thimble (2-Piece Assembly)
Pipe Shield, Header Shield (shipped attached to top of fireplace)
Additional Items Required
Gas Line Equipment (shutoff valve, pipe, etc.)
Electrical Equipment (min. 14 gauge, grounded line)
This Fireplace Requires 7 lbs. of 1/4” Crushed Glass
94500580 Platinum (10 lbs.)
94500581 Bronze (10 lbs.)
94500582 Cobalt (10 lbs.)
94500583 Black (10 lbs.)
Recommended Installation Procedure
Frame the opening for the fireplace. Make sure to allow for vent installation.
Install the vent, gas line and electrical hook-up.
Install the drywall.
Install the hearth (if applicable).
Install the facing (if applicable).
Install the mantel (if applicable).
Finalize the installation (see page 40).