ZC Kit – Large Pellet Insert
(99200149)
Page 7 of 8
10/9/06
© Travis Industries, Inc.
ZC Can Placement
•
Place the zc can inside the enclosure. The zc can must be placed so the front edge of the mounting flanges
are flush with the enclosure opening. Secure the enclosure to the floor protection (and sub-floor) with screws.
•
When venting horizontally the rear vent shield must be installed over the top of the zc can. When installed,
the rear vent shield should contact the thimble (it acts as a heat shield above the vent.
When in place these tabs
must be flush with the
enclosure opening.
Floor Protection
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAAAAAAA
A
A
A
A
A
A
A
A
AA
AA
A
A
A
A
AA
AA
AA
A
A
2-1/2” Min.
(both sides)
Secure the zc can to the
floor protection (and sub
floor) with screws.
For rear vent appliations, slide the
rear vent shield all the way back until
it contacts the wall thimble.