background image

E-FL-HB-0x00 IN THE NETWORK

Install one E-FL-HB-0x00
hub and use fiber cable  to
set up a workgroup by
connecting the hub to
terminal devices.

Install an optional backbone
uplink adaptor at the back of
the hub and use 10BASE-2,
10BASE-5, or fiber cable to
connect the workgroup to a
network backbone. 

Cascade two repeater hubs by
connecting fiber cable from a connector
at the front of the first hub to a
connector at the front of the second
hub.  

TECHNICAL SPECIFICATIONS

Standards

IEEE 802.3

Dimensions

17.25" x 8.5" x 1.7" 

(437 mm x 216 mm x 43 mm)

Power

Input Range:

100 to 240 VAC at 50 or 60 Hz, 3.0 A maximum. 
Rated at 40 watts maximum.

Environment

Operating Temperature:

0° to 50°C (32° to 122° F )

Storage Temperature:

-15° to 65°C (5° to 149° F )

Humidity

5% to 95%, non condensing 

Altitude

0 to 10,000 feet

Warranty

Lifetime

DECLARATION OF CONFORMITY

Name of Mfg:

Transition Networks 
6475 City West Parkway, Minneapolis MN 55344 USA

Model:

E-FL-HB-0x00 Series Unmanaged Fiber Hub 

Part Number:

E-FL-HB-0800, E-FL-HB-0800(SC), E-FL-HB-0400, 
E-FL-HB-0400(SC)

Regulation:

EMC Directive 89/336/EEC

Purpose:  To declare that the E-FL-HB-0800 or E-FL-HB-0400 to which this

declaration refers is in conformity with the following standards.

EMC-CISPR 22: 1985 Class A;  EN 55022: 1988 Class A;  EN 50082-1:1992;
EN 60950 A4:1997;  IEC 801.2, IEC 801.3, and IEC 801.4;  IEC 950

I, the undersigned, hereby declare that the equipment specified above conforms to the

above Directive(s) and Standard(s).

_November 10, 1999_____

Stephen Anderson, Vice-President of Engineering

Date

STAT

10BASE-FL

1

2

3

4

5

6

7

8

PWR

COL

ACT

BB

1

3

2

4

5

7

6

8

to hub, switch, or router

STAT

10BASE-FL

1

2

3

4

5

6

7

8

PWR

COL

ACT

BB

1

3

2

4

5

7

6

8

to hub, switch or router

STAT

10BASE-FL

1

2

3

4

5

6

7

8

PWR

COL

ACT

BB

1

3

2

4

5

7

6

8

STAT

10BASE-FL

1

2

3

4

5

6

7

8

PWR

COL

ACT

BB

1

3

2

4

5

7

6

8

Summary of Contents for E-FL-HB-0400

Page 1: ...imits for radio noise for digital apparatus set out on the radio interference regulations of the Canadian Department of Communications Le présent appareil numérique n émet pas de bruits radioélectriques dépassant les limites applicables aux appareils numériques de la class A prescrites dans le Règlement sur le brouillage radioélectrique édicté par le ministère des Communications du Canada European...

Page 2: ...DECLARATION OF CONFORMITY Name of Mfg Transition Networks 6475 City West Parkway Minneapolis MN 55344 USA Model E FL HB 0x00 Series Unmanaged Fiber Hub Part Number E FL HB 0800 E FL HB 0800 SC E FL HB 0400 E FL HB 0400 SC Regulation EMC Directive 89 336 EEC Purpose To declare that the E FL HB 0800 or E FL HB 0400 to which this declaration refers is in conformity with the following standards EMC CI...

Page 3: ... Coaxial RG58 ThinNet Impedance 50 Ω 10 MHz Mutual Capacitance 24 pF ft 20 10 MHz Maximum Cable Length 185 meters 610 feet Maximum number network connections 30 Minimum distance between connections 0 5 meters 1 6 feet Terminate 10BASE 2 cable at one end using a 50 ohm terminator and at the other end using a 50 ohm terminator grounded to earth ground AUI 10BASE 5 Cable Specifications 10BASE 5 CABLE...

Page 4: ...t against E FL HB 0x00 chassis 5 Secure backbone uplink adapter by installing retained screws through backbone uplink adapter into E FL HB 0x00 chassis 6 Is the B ack B one ACT ivity LED illuminated NO Disconnect and reconnect the backbone cable to restart the initialization process Restart the attached network device to restart the initialization process Contact Technical Support 800 260 1312 YES...

Page 5: ...LINKAlert is NOT enabled the port is partitioned investigate the device at the far end of the link If the fiber backbone adapter plate is installed and LINKAlert IS enabled determine and correct the cause of the Far End Fault Contact Technical Support 800 260 1312 NO Continue at step 6 Install E FL HB 0x00 at Site WARNING During the site installation handle the E FL HB 0x00 in such a way that the ...

Page 6: ...00 OPERATION Use the status LEDs to monitor E FL HB 0x00 operation in the network E FL 0X00 HUB INDICATORS P o W e R Steady LED indicates E FL HB 0x00 is connected to external AC power COL lision Flashing LED indicates network collisions B ACK B ONE INDICATORS STAT us Steady LED indicates for network connection a valid link and no partition or isolation One 1 continuous flashing blink indicates ne...

Page 7: ...ion within acceptable bounds NOTE In a coax thinnet installation the first and last device in the daisy chain must be terminated using a 50 ohm terminator Additionally the 10BASE 2 segment must be grounded to earth ground at one end To connect to 10BASE 2 network 1 Locate BNC uplink adapter installed at E FL HB 0x00 back See page 4 2 Locate or build IEEE 802 3 compliant 10BASE 2 cable and male BNC...

Page 8: ... Locate or build 10BASE FL compliant two stranded fiber cable with appropriate male TX to RX connectors installed at both ends 2 Connect male TX and RX cable connectors at one end of cable to TX and RX female connectors respectively on front of one hub 3 Connect male TX and RX cable connectors at other end of cable to RX and TX connectors respectively on front of second hub Connect E FL 0x00 Hub t...

Reviews: