Installation - Mechanical
CLCH-SVX013B-EN
19
To assemble the unit:
1. Locate the mounting hardware and gasket material.
2. All shipping supports and crating on the face of the
sections must be removed and discarded to permit
proper fit-up and sealing of the surfaces. Remove any
shipping bolts located on the mounting surfaces of the
sections (see
3. Apply the gasketing to one of the mating surfaces; see
, and
Figure 17.
Section-to-section installation
Butyl tape
0.375 in.T x 0.375 in.W
Indoor units
add additional layer of Butyl tape
0.375 in.T x 9.375 in.W
Indoor units - Gasket
Outdoor uits - Butyl tape
Figure 18.
Coil section-to-downstream section bolt up
with splash guard
Outdoor units - Butyl tape
0.375 in.T x 0.375 in.W
Indoor units wider than 110 in.
add additional layer of Butyl tape
0.375 in.T x 9.375 in.W
Indoor units - Gasket
Figure 19.
Stacked unit assembly
Gasket
X23010544010
1.00 inches T
x
4.00 inches W
4. If the unit is equipped with factory-mounted controls,
move adjacent subassembly within six inches and
fasten quick connects where the sections bolt together.
See
for low voltage. See
and
for high voltage.
Note:
Reference the appropriate controller manual for
more details on the installation of units with
factory-mounted controls.
Figure 20.
Horizontal section-to-section low voltage
quick connects
Use 2 x 4 inch wood to protect
hands from accidental pinching
Low voltage
Summary of Contents for Performance Climate Changer PSCA
Page 81: ......