Connecting to Tracer Summit
™
Packaged fresh air units can operate with
Trane building automation software,
Tracer Summit version 14.0 or later.
Note: Tape the non-insulated end of the
shield on shielded wire at the unit. Any
connection between the shield and
ground will cause a malfunction. If daisy-
chained in the unit, splice and tape the
shields to prevent contact with ground.
Communication Wiring
Note: Communication link wiring is a
shielded, twisted pair of wire and must
comply with applicable electrical codes.
An optional communication link provides
a serial communication interface (SCI)
between Tracer Summit
and each Fresh
Air unit (FAU) in the system. The FAU
system can have a maximum of 12 FAUs
per connection link to Tracer Summit. Use
a single 18 AWG shielded, twisted pair
wire with stranded, thinned copper
conductors to establish each
communication link between Tracer
Summit and each unit.
Installation Checklist
The checklist listed below is a summary
of the steps required to successfully
install a Packaged Fresh Air unit. This
checklist is intended to acquaint the
installing personnel with what is required
in the installation process. It does not
replace the detailed instructions detailed
in the applicable sections of this manual.
General Unit Requirements
o
Assemble and install the roof curb and
necessary gaskets. Make sure the curb
is level.
o
Install and secure the ductwork to the
curb or unit.
o
Check unit for shipping damage and
material shortage. Refer to the
Receiving Checklist
on page 9.
o
Rig the unit. Refer to Figure I-IP-2 page
41.
o
Place the unit on curb and check
leveling. Ensure that the unit-to-curb
seal is tight without buckles or cracks.
o
Install an appropriate drain line to the
evaporator condensate drain
connection. Refer to Figure I-MR-2 on
page 35.
Electrical Requirements
o
Verify that the electrical power supply
characteristics comply with the unit
nameplate specifications.
o
Inspect all control components; tighten
any loose connections.
o
Connect properly sized and protected
power supply wiring to a field supplied/
installed disconnect and unit power
terminal block, or to the optional unit
mounted disconnect switch.
o
Properly ground the unit.
Field Installed Control Wiring (Optional)
o
Complete the field wiring connections.
Note: All field installed wiring must
comply with NEC and applicable local
codes.
Gas Heat Requirements
o
Gas supply line properly sized,
supported, and connected to unit gas
train.
o
Install a
1
/
8
-inch N.P.T. plugged tapping,
accessible for test gauge connection, i
immediately upstream of gas supply
connection to unit.
o
Ground union must be installed
adjacent to the manifold for easy
servicing.
o
Drip leg installed in the gas piping near
the unit.
o
Additional shutoffs are located
externally of the jacket enclosure
where required by local code.
o
All gas piping joints properly sealed.
o
Gas piping leak checked with a soap
solution.
o
Main supply gas pressure adequate.
o
Refer to the Reznor Installation Form,
RGM 401, for additional information.
Note: All gas piping must comply with
applicable local codes.