Assembling Base Rails size 3 to 57
When a special base rail is ordered, or when it is specifically requested, base rails for M-Series unit
sizes 3 to 57 will be shipped separately. Base rails for unit sizes 66 to 120 are integral to the module
and do not require assembly.
Note:
The unit must be in the final installation location with the skid removed before proceeding.
These instructions are also provided in the paperwork that ships with the base rail.
To assemble the base rails to size 3 to 57 modules or subassemblies:
1.
Assemble the base rail as shown in
Figure 8
.
2. Assemble the base rail to the module as shown in
Figure 9
.
.
Figure 7.
Six-inch mounting leg installation
Assembling Optional 6-Inch Mounting Legs
All units or subassemblies that do not ship on a base rail ship with
4-inch mounting legs that secure the unit to the shipping skid. After
the unit is in place and the skids are removed, these mounting legs
may be used to secure the unit to the floor, housekeeping pad, or
mounting platform. If 6-inch mounting legs were ordered, use the
following procedure to assemble them to the module/subassembly:
Note:
The unit must be in the final installation location with the skid
removed before proceeding.
1.
Place a block under the unit to prevent the unit from sagging
while replacing the mounting leg.
2. Remove the 4-inch leg, all hardware, and the saddle bracket from
the unit.
3. Using the removed hardware, install the 6-inch leg as shown in
Figure 7
.
Figure 8.
Base rail assembly
Figure 9.
Mounting unit to base rails, sizes 3 to 57