Maintenance
Installation checklist
This list must be checked off by the installer to ensure correct installation
before the unit start up.
UNIT POSITION
Check clearance around condenser
Check clearance required for maintenance access
Check type and position of rubbers pads
CHILLED WATER CIRCUIT
Check thermometers and manometers presence and position
Check water flow rate balancing valve presence and position
Check presence of strainer ahead of evaporator
Check presence of air-purge valve
Check rinsing and filling of chilled water pipes
Check water pump(s) contactor interconnected to control panel
Check water flow
Check chilled water pressure drop through the evaporator
ELECTRICAL EQUIPMENT
Check installation and rating of mains power switch/fuses
Check electrical connections complied with specification
Check that electrical connections are in accordance with information on
manufacturer's identification plate
Check direction of rotation using phasemeter
Comments
…………………………………………………………………………………………………
…………………………………………………………………………………………………
…………………………………………………….............................................................
…………………………………………………………………………………………………
…………………………………………………………………………………………………
Signature:……………………………………………….Name:………...…………………
Order N°: ………………………………………………..
Work site: .....………………………………………………………………………………..
Please return to your local Trane Service Office
18
CGCL-SVX01B-E4
Summary of Contents for CGCL 200
Page 22: ...22 CGCL SVX01B E4 Notes...
Page 23: ...CGCL SVX01B E4 23 Notes...