Starter Module Configuration
The starter module configuration settings will be
checked (and configured for remote starters) during
start-up commissioning.
N
No
otte
e:: To configure starter modules and perform other
starter checks, it is recommended that the line
voltage three-phase power be turned off and
secured (locked out), and then that a separate
source control power (115 Vac) be utilized to
power up the control circuits. This needs to be
done in each panel.
Use the as-built starter schematic to ensure correct
fuse and terminals. Verify that the correct fuse is
removed and that the control circuit connections are
correct; then apply the 115 Vac separate source power
to service the controls.
Schematic Wiring Drawings
Please refer to the submittals and drawings that
shipped with the unit. Additional wiring drawings for
CenTraVac™ chillers are available from your local
Trane office.