
WSHP-SVX01Y-EN
21
Figure 14.
Right return/left supply - GEHE 6 to 10
tons (60 Hz); GEHE 6 to 7.5 tons (50 Hz)
2 1/8
"
(54
)
DRAIN CONNECTION
1/2" (22) SCHEDULE 40 PVC
1 3/4”
23 7/8”
79”
74 1/2”
36”
40 5/8”
4
5/8”
81”
85”
TOP VIEW
1 1/2”
W.O. “D” NPTI
24 VOLT
1 1/8” DIA.
WCI mounting location
23 1/4”
16 1/2”
6
1/2”
2
1/4”
HIGH VOLTAGE
7/8” DIA.
LEFT SIDE
W.I. “D” NPTI
A
C
B
BLOWER ACCESS
PANEL
18 3/8”
7 5/8”
14 1/2”
1”
4 7/8”
18 3/4”
5
/
8
”
3 1
/
8
”
BACK SIDE
1
1/4”
RETURN AIR
OPENING
1” DIA.
MOUNTING HOLE
4X’s
SUPPLY OPENING
1” DUCT FLANGE
Table 12.
Dimensional data right return/left supply - GEHE 6 to 10 tons (60 Hz); GEHE 6 to 7.5 tons (50 Hz)
GEH (60 Hz)
GEH (50 Hz)
A
B
C
D
72
—
36-1/4 in.
15-5/8 in.
6-5/8 in.
1-1/4 in.
90
72
36-1/8 in.
12-3/4 in.
6-3/4 in.
1-1/4 in.
120
90
36-1/8 in.
13 in.
7-1/4 in.
1-1/2 in.
Summary of Contents for Axiom GEH-E035
Page 122: ...122 WSHP SVX01Y EN N No ot te es s...
Page 123: ...WSHP SVX01Y EN 123 N No ot te es s...