14
WSHP-SVX01Y-EN
Unit Dimensions
Service Clearances
Per NEC requirements, 36 inches of access and working
space shall be provided and maintained around all
control boxes and electrical equipment to permit ready
and safe operation and maintenance of such
equipment. Local codes may require more clearance to
electrical equipment. Check all code requirements prior
to unit installation.
Figure 1.
Clearances - GEH 0.5 to 5 tons
1
4"
14
"
14"
14"
LEFT RETURN
BACK SUPPLY
UNIT FRONT
LEFT RETURN
RIGHT SUPPLY
LEFT RETURN
LEFT SUPPLY
UNIT FRONT
UNIT FRONT
3"
3"
14"
RIGHT RETURN
BACK SUPPLY
UNIT FRONT
RIGHT RETURN
LEFT SUPPLY
RIGHT RETURN
RIGHT SUPPLY
UNIT FRONT
UNIT FRONT
3"
14
"
1
4"
14"
14"
14”
14"
14"
14
"
14
"
1
4"
36"
36"
36"
36"
36"
36"
A minimum 14 inch clearance for servicing the unit is
required for all 0.5 to 5 ton configurations from other
mechanical and electrical equipment (where shown)
to enable panel removal from the unit for service/
maintenance ability. The optimum clearance
required is 20 inches.
Equipment containing a same-side supply/return
combination requires a 3 inches limitation on one
side. Access to the TXV may not be possible with this
3 inches clearance. This configuration is typically
applied in a corridor installation, where space
limitations force the left or right side of the unit
against a wall.
Figure 2.
Clearance - GEH 6 to 15 Tons
24"
TOP VIEW
24"
BLOWER ACCESS
PANEL
CONTR
OL
B
O
X
36"
Service clearance dimensions for the GEH 6 to15 tons horizontal
includes a two side access appropriate for control and blower
motor/wheel access.
Summary of Contents for Axiom GEH-E035
Page 122: ...122 WSHP SVX01Y EN N No ot te es s...
Page 123: ...WSHP SVX01Y EN 123 N No ot te es s...