Installation
CG-SVX06D-E4
34
Figure 20 - CGWN and CCUN main power supply connection (1) (205-211)
1 = Power cable inlet
2 = Disconnect switch
(1) shown here : CGWN. Components in same location on CCUN.
2
1
Electrical connections
CAUTION:
1. The greatest care should be taken
when cutting through passages
and installing electric wiring.
Under no circumstances should
chips of metal or cuttings of
copper or isolating material fall
into the starter panel or electric
components. Relays, contactors,
terminals and control wiring
should be covered and protected
before power supplies are
connected.
2. Install power supply cabling as
shown in wiring diagram.
Adequate cable gland should be
chosen, ensuring no foreign
bodies enter the electrical housing
or components.
CAUTION:
1. Cabling must comply with local
standards. The type and location
of fuses must also comply with
standards. As a safety measure,
fuses should be visibly installed,
close to the unit.
2. Only copper wiring should be
used. Using aluminium wires can
produce galvanic corrosion and
possibly lead to superheat and
failure of connection points.
Soft starter recommended setting
Acceleration time: 0.5 seconds full
speed
Start-up torque: 50%
Deceleration time: 0 seconds
Use adjustment setting button.