
HDWA-SVX001D-EN
21
be cut to suit the application, but should cover the
entire face of the support.
Leveling the Unit
N
No
otte
e:: The chiller MUST be set level within 1/4 in.
(6.35 mm) over its length and width.
1. Use a water level to align the tube sheet tooling
holes or bottom edge of the tube sheet axially along
both the condenser and evaporator; refer to the
following figures.
2. Use a water level to align the tooling holes across
the condenser tube sheet; refer to the following
figures.
IIm
mp
po
orrtta
an
ntt:: Do NOT level the tooling holes from the
evaporator to the condenser as they
may be at different heights.
Figure 10.
Leveling the chiller (front and left views)
Figure 11.
Leveling the chiller (tooling hole)
Tooling hole
Refrigerant Pressure Relief Valve Venting
W
WA
AR
RN
NIIN
NG
G
C
Co
on
nffiin
ne
ed
d S
Sp
pa
acce
e H
Ha
azza
arrd
dss!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
D
Do
o n
no
ott w
wo
orrkk iin
n cco
on
nffiin
ne
ed
d ssp
pa
acce
ess w
wh
he
erre
e rre
effrriig
ge
erra
an
ntt
o
orr o
otth
he
err h
ha
azza
arrd
do
ou
uss,, tto
ox
xiicc o
orr fflla
am
mm
ma
ab
blle
e g
ga
ass m
ma
ay
y b
be
e
lle
ea
akkiin
ng
g.. R
Re
effrriig
ge
erra
an
ntt o
orr o
otth
he
err g
ga
asse
ess cco
ou
ulld
d d
diissp
plla
acce
e
a
av
va
aiilla
ab
blle
e o
ox
xy
yg
ge
en
n tto
o b
brre
ea
atth
he
e,, cca
au
ussiin
ng
g p
po
ossssiib
blle
e
a
assp
ph
hy
yx
xiia
attiio
on
n o
orr o
otth
he
err sse
erriio
ou
uss h
he
ea
alltth
h rriisskkss.. S
So
om
me
e
g
ga
asse
ess m
ma
ay
y b
be
e fflla
am
mm
ma
ab
blle
e a
an
nd
d o
orr e
ex
xp
pllo
ossiiv
ve
e.. IIff a
a lle
ea
akk
iin
n ssu
ucch
h ssp
pa
acce
ess iiss d
de
ette
ecctte
ed
d,, e
ev
va
accu
ua
atte
e tth
he
e a
arre
ea
a
iim
mm
me
ed
diia
atte
elly
y a
an
nd
d cco
on
ntta
acctt tth
he
e p
prro
op
pe
err rre
essccu
ue
e o
orr
rre
essp
po
on
nsse
e a
au
utth
ho
orriitty
y..
N
No
otte
e:: Vent pipe size must conform to the ANSI/
ASHRAE Standard 15 for vent pipe sizing. All
federal, state, and local codes take precedence
over any suggestions stated in this manual.
All relief valve venting is the responsibility of the
installing contractor.
All HDWA chillers use evaporator and condenser
pressure relief valves (refer to the following figure) that
must be vented to the outside of the building.