AFDH-SVN01A-EN
53
Installation
Note:
These power connections should be re-torqued to 44 foot-pounds after the first three to six
months of operation and then on an annual basis thereafter.
4. Put the transition cover back in place and reseal it when finished.
1.
Output motor leads coming in from the right hand cabinet compartment (drive module) and
routed up through the CT’s to the motor terminal access cutout
2. Motor leads routed through cabinet motor terminal access cutout
3. Transition cover removed and Z bracket blanked out of photo for clarity
4. Factory installed motor leads are long enough to extend approximately 18-inches out from the
access cutout
5. Attach both T1 motor leads to compressor motor terminal T1
6. Attach both T2 motor leads to compressor motor terminal T2
7.
Attach both T3 motor leads to compressor motor terminal T3
8. Compressor motor terminal board
Figure 29. Output wiring from AFDH to CTV motor
Summary of Contents for AFDH
Page 11: ...AFDH SVN01A EN 11 Nameplates Note This page has been intentionally left blank...
Page 65: ...AFDH SVN01A EN 65 Installation Note This page intentionally left blank...
Page 66: ...66 AFDH SVN01A EN Installation Note This page intentionally left blank...
Page 67: ...AFDH SVN01A EN 67 Installation Note This page intentionally left blank...