![Trainsway ZH650 Installation And Operating Instructions Manual Download Page 27](http://html1.mh-extra.com/html/trainsway/zh650/zh650_installation-and-operating-instructions-manual_1148591027.webp)
26
4.
Operation
WARNING! Do not use the machine until you have read and understood the entire manual and
the warning provided.
Before carrying out any operation, deflate the tire, take off all the wheel balancing weights and
remove the inner air valve.
The operation of the tire changer is divided into three parts:
a) BREAKING THE BEAD b) REMOVING THE TIRE c) MOUNTING THE TIRE
CAUTION! It is advised to equip the tire changer with the pressure regulator.
Breaking the bead
WARNING!
Bead breaking must be done with the utmost care and attention. When the bead
breaker pedal is operated the bead breaker arm moves quickly and powerfully. Anything within
it´s arrange of action can be in danger of being crushed.
-
Check that the tire is deflated. If not, deflate it.
-
Close the turntable clamps completely to prevent accidents from happening during the bead
breaking operation.
WARNING! Bead breaking with the clamps in open position can be extremely dangerous for
operator’s hands.
During bead breaking operations NEVER touch the side of the tire.
-
Position the wheel against the rubber stops on
the right side of the tire changer .
-
Position the bead breaker against the tire bead
at a distance of about 1 cm from the rim (fig.
12a).
-
Press down the pedal C (fig. 12) to activate the
bead breaker and release it when the blade has
reached the end of its travel or in any case when
the bead is broken.
-
Rotate the tire slightly and repeat the operation around the entire
circumference if the rim and from both sides until the bead is completely
detached from the rim.
Fig.12
Summary of Contents for ZH650
Page 18: ...17...
Page 33: ...32...
Page 56: ...55 Exploded drawings Column assembly Fig 34...
Page 57: ...56 Turntable assembly Fig 35...
Page 58: ...57 Gearbox motor assembly Fig 36...
Page 59: ...58 Body assembly Fig 37...
Page 60: ...59 Pedal Assembly Fig 38...
Page 61: ...60 Bead Breaker Cylinder Breaker Arm Assembly Fig 39...
Page 62: ...61 Quick inflating system Optional Fig 40 Assemble...
Page 63: ...62 Electrical Diagram Fig 41 Fig 42...
Page 65: ...64 Drawing of installation for small package Fig 44...