![Trainsway ZH650 Installation And Operating Instructions Manual Download Page 24](http://html1.mh-extra.com/html/trainsway/zh650/zh650_installation-and-operating-instructions-manual_1148591024.webp)
23
Mounting the column
-
Now put the column (1, fig.4) in the square
recess (2, fig.4), this can be done in two
ways, considering the weight of the column.
You can lift the column, using a sling which
meets the European standards and that can
handle the weight. U could also lift the
column on the machine with two persons,
make sure you lift from the legs with a
straight back.
-
Allign the holes in the column and the
recess and put pin H (fig.5) in place and
tighten with washer G (fig.5) and bolt F
(fig.5).
-
Now put the airline (6, fig.4) through the
hole in the machine along the backside of
pin L (fig.5) to avoid damage to the hose.
-
Now connect the column with the piston
rod (I, fig.5), align the holes and connect
them using bolt J (fig.5), now place the
washer and tighten nut K (fig.5) firmly.
-
Now remove the side cover of the machine
and connect the air line (6, fig.4=1, fig.6) to
the regulator (3, fig.6), by pressing the line
in the coupler (2, fig.6). Make sure if the line
is locked.
CAUTION! When column installation, keep
column vertical, prevent it from tilting to
avoid injury!
The horizontal arm can move freely, be
careful!
Fig. 4
Fig. 5
Fig. 6
Summary of Contents for ZH650
Page 18: ...17...
Page 33: ...32...
Page 56: ...55 Exploded drawings Column assembly Fig 34...
Page 57: ...56 Turntable assembly Fig 35...
Page 58: ...57 Gearbox motor assembly Fig 36...
Page 59: ...58 Body assembly Fig 37...
Page 60: ...59 Pedal Assembly Fig 38...
Page 61: ...60 Bead Breaker Cylinder Breaker Arm Assembly Fig 39...
Page 62: ...61 Quick inflating system Optional Fig 40 Assemble...
Page 63: ...62 Electrical Diagram Fig 41 Fig 42...
Page 65: ...64 Drawing of installation for small package Fig 44...