Trace2O HydroTest HTCOD-TR Instruction Manual Download Page 5

1.

 

HTCOD-TR

 

 

 

 

1.3 

Unpacking

 

Carefully inspect all  items to ensure that every part on the list below is present 
and  no  visible  damage  has  occurred  during  transportation. 

Store the packing material to return the unit for repair or other kinds of transport. 

The table below shows the parts included in the packing. 

Part list

 

 

Part 

 

Quantity 

Thermoreactor HTCOD-TR 

Power  cord  (European  version) 

Instruction  manual 

 

1.4 

Connecting

 

On the  reverse side of the reactor: 

 

Selector  for  voltage  115  V  /  230  V 

 

Plug for power cord 

 

Fuse 4 AT 

 

ON/OFF Switch (0/I) 

Before connecting to power supply check that the ON/OFF switch is turned to “0” 
and check that the voltage selector (115 V/230 V) corresponds to the voltage 
supplied by the electric socket. 

 

 
 
 

Cover 

 

 
 
 
 
 
 
 
 

 

 

Fuse 

Plug for power cord 

Selector 
for voltage 

 

 

ON/OFF Switch 

Summary of Contents for HydroTest HTCOD-TR

Page 1: ...HTCOD TR HydroTest COD Thermoreactor Instruction Manual...

Page 2: ...symbols 3 1 2 Important information 4 1 3 Unpacking 4 1 4 Connecting 4 1 5 Buttons 6 1 6 Function of buttons 6 2 Work session 19 3 Beeper 19 4 Function schematics 20 5 Maintenance 21 6 Cleaning 21 7...

Page 3: ...and specified in the corresponding method descriptions Don t exceed temperatures or time spans in any case All warning labels must NOT be removed and should be replaced if they become damaged or fade...

Page 4: ...the ventilation slots Air circulation is necessary to prevent the reactor from overheating If the air circulation is restricted it could cause fire or damage the reactor Never open the reactor housin...

Page 5: ...he packing Part list Part Quantity 1 Thermoreactor HTCOD TR 1 2 Power cord European version 1 3 Instruction manual 1 1 4 Connecting On the reverse side of the reactor Selector for voltage 115 V 230 V...

Page 6: ...matically switches off Heat key By pressing this key after switching the instrument on using the main on off switch see page 17 the reactor will heat up to the pre selected temperature Temp key By pre...

Page 7: ...nently By pressing the Start key the timer starts the work cycles corresponding to the cho sen time span indication by Time LED Starting the work cycle the Time LED changes from lighted to flashing Wh...

Page 8: ...aiting for pressing START key On On On Press Status 1 Press for t 30 60 120 Selection possible Temperature controlled for stability of the selected temperature After pressing Start key Status 4 t Igno...

Page 9: ...nstructions set out in the Material Safety Data Sheet MSDS Chapter 6 and or 13 A contaminated aluminium block must be replaced prior to further use of the reactor The reactor should be sent to the man...

Page 10: ...10 8 Wiring diagramm...

Page 11: ...ff off on on yes 4 Wiring problem internal connection incomplete on off on off off yes 5 Heating problem no power reactor power probe problem on off on off on yes 6 T value underrange Mainboardfaulty...

Page 12: ...12 Trace2o Limited The Technology Centre Wagtech Court Station Road Thatcham Berkshire RG19 4HZ Tel 44 0 1635 566772 Fax 44 0 1635 873509 sales Trace2o com www Trace2o com...

Reviews: