Copyright
Trace Engineering Co., Inc.
Telephone (360) 435-8826
Part Number 3471
5916 195th Street, NE
Fax (360) 435-2229
Released: Thursday, April 29, 1999
Arlington, WA 98223 USA
PM SW 175/250 Dual Diagram
4-13
PM 175/250 D Left Panel
Front view of PM SW 175/250 D showing standard
components plus PVGFP and three C40’s w/BTS’s
PM SW 175/250 D right side panel including
DCBB, DC175/250, and PV
PM 175/250 D Front View
PM SW 175/250 Dual System Assembly
Sequence
1.
Feet (Page 6-14)
2.
Edge guards
3.
C40 (Page 5-7 if equipped)
4.
Neutral and ground bonding block (Page 5-21, left
panel for SW, right panel for DR)
5.
DC bonding block (Page 5-15, left for DR, right for
SW)
6.
DC175/250 (Page 5-14)
7.
DC20/60/110 (Page 5-12)
8.
IOX60 (Page 5-19)
9.
any additional AC or DC breakers
10. Slider (Page 6-23)
11. Cover (Page 6-18)
12. connect ground conductors
13. AC output cables
14. AC neutral cables
15. DC cables
16. Decals
17. Lid (Page 19)
19. Door (Page 15)
Invert PM to install feet; revert to continue. Remove
appropriate component instruction sheets and arrange in
order of installation. Gather all tools and components listed
in the instructions and place then nearby. Prepare
components as instructed on the component assembly
pages and set aside. When all components are prepared
and handy, assemble each component in the sequence
shown above, referring to the component assembly
instructions as required.