9
PERFORMING TIGHTNESS TEST (cont)
9. Connect the tubing
to the device under
test. Pressurize the
device.
P2 will display the
current pressure.
10. Tap the “Play”
icon to begin the
test. . A count-
down timer will
begin. This is the
stabilization peri-
od.
11. Once the stabiliza-
tion period is over
the test will begin.
The countdown
timer resets and
counts down during
the test.
P1will become the
start pressure and
P2 will be the cur-
rent pressure being
measured.
The standing pres-
sure test will run for
the length set in the
settings menu.
12. When the test is
complete the
results will be
shown. This infor-
mation can be
sent in a CSV file
via email as
required.
To exit Tightness
Test, tap the drop
down menu and
tap “Main Real-
Time”.
Summary of Contents for SP620
Page 14: ...NOTES ...
Page 15: ...NOTES ...