If converting to propane see
conversion instructions on page #6
before proceeding.
Install panels according to the
TCWS.54CE Installation and
Operating manual prior to burner
installation. (Page 23)
1
Attach fuel fl ex line and pilot assembly
to bulkhead fi ttings. (Fig. #1)
1
BURNER TRAY ASSEMBLY
Fig #1
2 3.4 LBS SAND
4 PEBBLE
ASSEMBLIES
(Includes front and rear pebble
clusters and three top rocks)
2 BURNER ASSEMBLIES
1 PILOT ASSEMBLY
1 1/2 SS FLEX LINE
2 EQUALIZER ROCKS
1 HARDWARE PACK
2
TCWS.54NG04.C 040907
Contents of Package
Tranquility Burner Installation