Fig #25
NG
LP
Caution:
The center post must be up for natu-
ral gas and down for propane for the
appliance to operate correctly.
7. Remove access panel, 10 screws, and
set aside (Fig. #26)
8.
Remove the minimum rate screw located
in the valve. (Fig. #22)
9.
Replace the minimum rate screw with the
one provided in the propane conversion
kit supplied with this burner. Ensure that
the screw is fully installed. (Fig. #23)
10.
Pull off the rubber cap from the top of
the pressure regulator. (Fig. #24)
11.
Press down on the center post and rotate
90°. The center post should stay down.
(Fig. #25). Replace the rubber cap.
Repeat steps 8 through 11 for other valve.
12.
Fill in the date and the name of the
person who performed the conversion
in the white area on the conversion
label. Peel off the protective backing and
apply the conversion label directly over
the gas specifi cations on the rating label.
13.
Attach the access panel to the side of
the fi rebox with the previously removed
screws. (Fig. #26)
Note: Gasket must be installed with
access
panel.
The minimum rate screw is sealed
with an o-ring. Use a thin bladed
screwdriver to back the screw out
to the limit of the threads.
A groove on the screw body will
be
visible just above the valve body.
Insert a thin tool (knife blade or thin
screwdriver blade) into the groove
and gently pry the screw up.
It helps to rotate the screw while
lifting on it.
TC54.NGO3C2 070211-16
Fig #22
Fig #23
Fig #24
Fig #26
Minimum
rate screw
Minimum
rate screw
LP GAS/
DU GAZ LP
12.5 in/wc /12.5 po/c.e.
(3.11 kPa)
13.9 in/wc / 13.9 po/c.e.
(3.45 kPa)
11.0 in/wc / 11.0 po/c.e.
(.95 kPa)
#44 (2.18 mm)
Max.: 83,700 (24.53)
Min.: 67,000 (19.63)
230910 6-TC54C2 5052.520862
Date: ______________________
By / Par: ___________________
Kit# TC54.LPCE02 for use with model /
Pour utilise avec du modèle:
TC54.CE2
This appliance was con-
verted to PROPANE GAS
with this kit on this date
by the organization which
accepts the responsibility
that this conversion has
been properly made. / Cet
appariel etair converter au
gaz LP par l’emploi de la
trousse de conversion par
une organization qui ac-
cepte la responsibilité pour
une installation en bon état.
ADD DATE
ADD NAME
9
Summary of Contents for TC54.NG03C2
Page 13: ...TC54 NGO3C2 070211 16 Notes 13 ...
Page 14: ...TC54 NGO3C2 070211 16 Notes 14 ...