5056.426C8
6
TC42_NG02DN_100117-12
Gas plumbing and vent con-
nections should be completed
before proceeding.
The logs are fragile, and should
be handled with care. Unpack and
inspect log set. There should be a
total of seven logs.
Position the logs as indicated by
the following pictures. The three
main logs have holes and / or pins.
Engage each pin in the corre-
sponding holes. The four smaller
logs do not have holes or pins.
They rest in position. Locate as
per the diagrams (Figures 11-18).
Log Placement
1
Figure 11: First log placement.
2
Figure 12: 2nd log placement.