Control Panel Installation
NOTE: The CAT5e cable has a maximum length of 50 feet and so the touch pad must be
installed within this distance.
NOTE: Make sure that the touch pad is fully charged and its ON/OFF switch is in the ON
position before mounting the touch pad in its frame.
NOTE: Make sure that the AC power to this appliance is turned off before installing the
touch pad.
Place touch pad frame template at desired point against drywall. Use a level to finalize the template
position .
1. Mark the inside of the template with a pencil (Figure 57).
2. Cut out the touch pad frame opening along the pencil mark (Figure 58).
3. Bring one end of the CAT5e cable out through the opening from behind the drywall(Figure 59).
Figure 56: Leveling the template.
Figure 57: Drawing the cut out.
Figure 58: Cutting out the panel opening.
Figure 59: CAT 5 cable.jpg
42
031220-60
Architectural Series
100004782