background image

- 6 - 

tousek

  /  E_FOLD330_43300306  /  31. 07. 2019

Before inserting  the telescopic arm please unlock the automation (emergeny release) and  turn it (as far as it goes) in the 

direction of the arrow. Turn the shaft back of about 5°. With the door closed push the telescopic arm onto the shaft of the motor 

and secure it with the worm screw.

Make sure that the doors open and close completely. 

If this procedure is not  be possible due to an inside wall, you can also choose another mounting procedure (see below), where 

the automation is  mounted in the entrance width of the gate .

Turn back (5°)

Emergency release

Insert  the emergency release key  in the emergency unlocking 

device (on the front of the automation) and turn it up to the end 

in a counterclockwise direction.

The automation is now unlocked  and can be moved manually.

To restore the working condition simply turn the key clockwise 

up to the end.

Setting of the power

Using the two bypass screws on the front side of the operator 

you can separately adjusted the opening and the closing force.

Closkwise rotation 

> bigger force

Anticlockwise rotation  > smaller force

Summary of Contents for 11410010

Page 1: ...Connection and installation guide Folding gate operator FOLD 330 L R...

Page 2: ...reach Before beginning with the installation the installer has to make sure that all mechanical components of the gate facility like carrier profile rail gate frame and panels guiding elements etc ar...

Page 3: ...quent installation Motors with hydraulic lock normally don t need the electric lock In order to achieve a fixed locking of the door in the end positions also in case of blocking operators it can be ne...

Page 4: ...gate Before mounting the motor please make sure that the gate is sturdy and torsion free Please notice that the hinges 1 and 2 have to be as free of tension and play as possible and that the second do...

Page 5: ...he telescopic arm both forming tube and flat iron To avoid tensions when in the retracted state the lenghts of the telescopic arm has to be approx 5cm shorter than the lenght mentioned above 580mm wit...

Page 6: ...choose another mounting procedure see below where the automation is mounted in the entrance width of the gate Turn back 5 Emergency release Insert the emergency release key in the emergency unlocking...

Page 7: ...tousek E_FOLD330_43300306 31 07 2019 7 Bowdencable L 3500mm For emergency release pull the lever upwards 70mm 240mm 3 Release with bowden cable Folding gate operator FOLD 330 L R...

Page 8: ...ple representation Not all the security components which are possibly required for your specific application are included In order to guarantee complete safety and security it is extremely important t...

Page 9: ...31 07 2019 9 FOLD 330 R right operator Dimensions in mm We reserve the right to change dimensions and technical specifications without prior notice 5 Dimensioned drawing Folding gate operator FOLD 330...

Page 10: ...ves and rails a weather protection roof cover should be provided A distance of 100mm between drive shaft and door hinge 4 must be strictly observed Depending on the mounting position of the drive the...

Page 11: ...le time to the market surveillance authorities in response to a duly substantiated request TOUSEK Ges m b H A1230 Wien Zetschegasse 1 Austria is authorized to compile the technical documentation The i...

Page 12: ...iwicka 67 Tel 48 32 738 53 65 Fax 48 32 738 53 66 info tousek pl Tousek s r o Czech Republic CZ 252 61 Jene u Prahy Pr myslov 499 Tel 420 777 751 730 info tousek cz We reserve the right to change dime...

Reviews: