D2-1
MECHANICAL ADJUSTMENTS
1. CONFIRMATION AND ADJUSTMENT
Read the following NOTES before starting work.
• Place an object which weighs between 450g~500g on
the Cassette Tape to keep it steady when you want to
make the tape run without the Cassette Holder. (Do not
place an object which weighs over 500g.)
CONFIRMATION AND ADJUSTMENT OF REEL
DISK HEIGHT
1-1:
1.
2.
3.
4.
Turn on the power and set to the STOP mode.
Set the master plane (JG022) and reel disk height
adjustment jig (JG024A) on the mechanism framework,
taking care not to scratch the drum, as shown in Fig. 1-
1-A.
While turning the reel and confirm the following points.
Check if the surface "A" of reel disk is lower than the
surface "B" of reel disk height adjustment jig (JG024A)
and is higher than the surface "C". If it is not passed,
place the height adjustment washers and adjust to
10(+2, -0)mm.
Adjust the other reel in the same way.
Fig. 1-2-B
1-2: CONFIRMATION AND ADJUSTMENT OF TENSION
POST POSITION
1.
2.
3.
Set to the PLAY mode.
Adjust the adjusting section for the Tension Arm
position so that the Tension Arm top is within the
standard line of Main Chassis.
While turning the S Reel clockwise, confirm that the
edge of the Tension Arm is located in the position
described above.
Fig. 1-2-A
Standard line of Main Chassis
Tension Arm
0.5mm (Adjusting range)
Reel Disk Height Adjustment Jig
(JG024A)
Fig. 1-1-A
Reel Disk
Height Adjustment
Washer
2.6x4.7xT0.13
2.6X4.7xT0.25
(B)
(C)
Master Plane (JG022)
Fig. 1-1-B
(A)
10(+0.2, -0)mm
Master Plane (JG022)
Reel Disk Height
Adjustment Jig
(JG024A)
Adjusting section for the
Tension Arm position
Bend
Tension Band
The Tension Arm top will
move to the outside direction
of the Main Chassis.
The Tension Arm top will
move to the inside direction
of the Main Chassis.
1-3: CONFIRMATION OF PLAYBACK TORQUE AND
BACK TENSION TORQUE DURING PLAYBACK
Load a video tape (E-180) recorded in standard speed
mode. Set the unit to the PLAY mode.
Install the tentelometer (JG185) as shown in Fig. 1-3.
Confirm that the meter indicates 20
±
2gf in the
beginning of playback.
1.
2.
• USING A CASSETTE TYPE TORQUE TAPE (KT-300NR)
1.
2.
3.
After confirmation and adjustment of Tension Post
position (Refer to item 1-2), load the cassette type
torque tape (KT-300NR) and set to the PLAY mode.
Confirm that the right meter of the torque tape indicates
50~90gf•cm during playback in SP mode.
Confirm that the left meter of the torque tape indicates
25~40gf•cm during playback in SP mode.
Fig. 1-3
Tentelometer
(JG185)
Video Tape
Guide Roller
P1 Post
Summary of Contents for VTW21FQR
Page 116: ......