6 Commissioning
Commissioning should be done only by qualifi ed personnel (Toshiba and Distributors).
6.1 Installation and functional check
Make sure that all electrical connections are in order before you take your Redundancy box in operation:
•
Visual inspection of connections
•
Control of the system for damage and pollution
•
Open locking device
6.2 Switching on the Redundancy box
When all installation inspections were successfully carried out, switch on the supply voltage and measure
them. The supply voltage should be 230 VAC.
Only after that close the locking device and the unit is ready for operation.
After switching on, the control goes through internal functions. After a successful start, the splash screen
appears on the display for a few seconds. The control program of the Redundancy box is now in operati-
on.
Summary of Contents for TCB-ACREDU1-E
Page 2: ...2 I TOSHIBA VERSION E ...
Page 26: ...26 I TOSHIBA ...
Page 27: ...TOSHIBA I 27 8 19 Circuit diagram ...
Page 28: ...28 I TOSHIBA 8 20 Declaration of conformity ...
Page 30: ...30 I TOSHIBA ...
Page 31: ...TOSHIBA I 31 ...