- 8
Preparations for Inspection and Maintenance of Equipment (Powering-Off)
1) Stop the equipment and check that the motor has
completely stopped.
2) Press the interlock switch on the operation panel (See Fig. 1 in the next section).
The light on the switch should turn on.
3)
Turn off the external main power supply. Disconnect and lockout the main
power.
4)
Turn off and lock out
the control power supply.
5)
Turn off an lock out
any other job specific power feeding the drive.
6) Wait for 15 minutes or more for the bus to discharge.
7) Verify that all power is removed by measuring the main, the DC bus, the control,
and any other external source voltage levels with properly rated measuring
equipment.
Note! A meter rated for 5kV is required to safely check the main circuit
voltages.
8) Ground the 3-phase input power supply terminal at the main circuit input
terminals. (Grounding is automatic when the equipment is supplied with a JK type
incoming starter.)
9) Perform the necessary maintenance.
Stop the
equipment
Main power
OFF
Control power
OFF
Wait for DC bus
discharge
Voltage check
Work
Grounding
Summary of Contents for T300MVi MEDIUM VOLTAGE
Page 18: ... xviii This page intentionally left blank ...
Page 85: ... 64 DRIVE INSTALLATION DRAWINGS cont d Frame G4P drive lifting and assembly ...
Page 86: ... 65 DRIVE INSTALLATION DRAWINGS cont d Frame G4P drive main cable installation ...
Page 87: ... 66 DRIVE INSTALLATION DRAWINGS cont d Frame G4P module lifting and installation D C B A ...
Page 89: ... 68 DRIVE INSTALLATION DRAWINGS cont d Frame H4P drive lifting and assembly ...
Page 90: ... 69 DRIVE INSTALLATION DRAWINGS cont d Frame H4P drive main cable installation ...
Page 91: ... 70 DRIVE INSTALLATION DRAWINGS cont d Frame H4P module lifting and installation ...