Test Program for Field.
Satellite L20 Maintenance Manual(960-Q01)
133
3.16 Running Test
NOTES:
1.
You may add or delete subtests using the Running Test Edit Item function, see Section
3.20.
2.
Do not forget to insert a work disk in the FDD. If a work disk is not inserted an error
will be generated during the Floppy Disk Test.
3.
If the test completes successfully an “PASS” sign with blue letters displays on the
screen.
4.
If the test fails or is interrupted before completion an “FAIL” sign with red letters
displays on the screen.
5.
If running item not select an “NOITEM” sign with green letters display on the screen.
6.
All errors which occur during execution of the Running Test are logged in the Log
File.
7.
This program is executed according to the
Count Loop
number selected in the
Running Test Edit Item, see Section 3.20. To terminate the program, press Ctrl +
Break.
Summary of Contents for Satellite L20
Page 12: ...Chapter 0 12 Satellite L20 Maintenance Manual 960 Q01 ...
Page 13: ...Satellite L20 Maintenance Manual 960 Q01 1 i Chapter 1 Hardware Overview ...
Page 14: ...1 ii Satellite L20 Maintenance Manual 960 Q01 1 Hardware Overview ...
Page 41: ...Chapter 1 Hardware Overview Satellite L20 Maintenance Manual 960 Q01 25 ...
Page 44: ...Chatper 1 Hardware Overview 28 Satellite L20 Maintenance Manual 960 Q01 ...
Page 144: ...Satellite L20 Maintenance Manual 960 Q01 4 i Chapter 4 Replacement Procedures ...
Page 145: ...Replacement Procedures 4 ii Satellite L20 Maintenance Manual 960 Q01 4 ...
Page 202: ...Satellite L20 Maintenance Manual 960 Q01 App i Appendices ...
Page 203: ...App ii Satellite L20 Maintenance Manual 960 Q01 ...
Page 213: ...Handling the LCD Module A 6 Satellite L20 Maintenance Manual 960 Q01 ...
Page 262: ...Wiring Diagrams F 2 Satellite L20 Maintenance Manua 960 Q01 ...