CAUTION
When the remote controller is used for the first time, it accepts an operation approx. 5 minutes after the power
supply has been turned on.
It is not a trouble, but is because the setup of the remote controller is being checked.
For the second power-ON time and after, approx. 1 minute is required to start the operation by the remote
controller.
8
TEST RUN
NOTE
Do not use the forced test run for cases other than the test run because it applies an excessive load to the
devices.
How to execute a test run
Using the remote controller, operate the unit as usual.
For the procedure of the operation, refer to the attached Owner’s Manual.
A forced test run can be executed in the following procedure if the operation stops by thermo.-OFF.
(This method is limited to when wired remote controller is installed.)
In order to prevent a serial operation, the forced test run is released after 60 minutes have passed and returns to
the usual operation.
Before test run
•
Before turning on the power supply, carry out the following procedure.
1) Using 500V-megger, check 1M
Ω
or more exists between the terminal block 1 to 3 and the earth.
If 1M
Ω
or less is detected, do not run the unit. Do not apply to the remote controller circuit.
2) Check the valve of the outdoor unit being opened fully.
•
To protect the compressor at activation time, leave power-ON for 12 hours or more be for operating.
Summary of Contents for RAV-SM562KRT-E
Page 25: ...EN MEMO ...
Page 47: ...FR MÉMO ...
Page 69: ...DE NOTIZEN ...
Page 91: ...IT MEMORIA ...
Page 113: ...ES MEMO ...
Page 135: ...PT MEMO ...
Page 157: ...NL MEMORANDUM ...
Page 179: ...GR MNΉMH ...
Page 180: ...1074008001 1 ...