10
6
FIXATION AFTER CONNECTION PIPES
1. After connection to pipes, fix the PMV Kit using the attached binding band so that it is held
closely to the gas pipe.
2. Set the hanging bolts for supporting pipes which are mounted at front and rear sides of PMV
Kit at within 1m intervals.
Binding band L
Binding band M
Binding band M
Heat insulating pipe
Refrigerant pipe
(Liquid side)
Heat insulating pipe
Refrigerant pipe
(Liquid side)
Binding band M
Binding band L
Binding band M
Refrigerant pipe
(Gas side)
1 m or less
Hanging bolt
Hanging bolt
PMV Kit
Refrigerant pipe