Page 34
CHECK
GENERAL
A F T E R
I N S T A L L A T I O N ,
B U T B E F O R E
ENERGIZING THE CONTROLLER for the first
time, follow the procedure below to verify that
the equipment is properly installed and
functional.
Prior to operating the controller, be sure
that the proper withdrawable contactor
carriage is installed in the medium
voltage compartment.
There is a data label (Fig.
on the
s i d e o f
each
contactor
carriage
indicating the configuration of that
particular unit. A corresponding label is
located on the inside of each medium
voltage controller compartment door.
Before installing a contactor carriage in
a n y c o m p a r t m e n t , v e r i f y t h a t t h e
information on the two labels agrees
completely.
In
particular,
the
following
information
must agree:
1.
2.
3.
4.
5.
6.
Part
n u m b e r o f
contactor
carriage.
Power fuse type, voltage and
current
rating
Control voltage and frequency
Contactor type, magnetically
held or latched
Single or dual CPT
Any
optional
features
Check connections
Although the
equipment and devices have been
completely tested at the factory, a final
field check should be made that all
electrical
w i r i n g
and
bus
bar
connections are correct and have not
become
loose
in
transportation
(Fig. 40).
Refer to MAINTENANCE
Section for electrical joint specification.
Fig. 39
Data Label on Contactor Carriage
Fig. 40
Check Connections
All blocks or other temporary braces
used for shipment must be removed.