Page 28
INSTALLATION
INSTALLATION SITE PREPARATION
It is recommended that site preparation be
completed before the controller is unpacked,
so that possible problems such as headroom,
conduit
location,
cable
tray
locations,
ventilation, etc. can be solved, assuring a
proper installation in compliance with the
building plans and codes.
The floor on which the controller will be placed
must be level so that the enclosure is not
distorted when bolted in place. Ensure the
equipment adequately clears any underground
raceways or cables.
MOUNTING
Each shipping section must be leveled and
firmly secured to its supporting foundation.
Steel shims may be used for final leveling
(Fig.
if necessary. When three or more
shipping sections are to be arranged in one
continuous line-up, the center shipping section
should normally be the first located.
Follow the equipment outline drawings to
determine the location of the mounting bolt
holes and any conduit locations.
Sill channels may or may not be furnished,
depending on order specifications. Refer to
outline drawings furnished for location of
sill channels, if furnished.
Various methods may be used to anchor the
enclosure
t o t h e f o u n d a t i o n ,
including
expandable inserts or
bolts embedded in
concrete. The recommended size for anchor
bolts is
(Fig. 31).
H e a v y
Equipment.
Enclosure
m u s t b e
securely
t o
prevent tipping over.
Fig.
30
Leveling Using Shims
FLOOR
CONTROLLER
BOTTOM
PLATE
BOLT
FOR ANCHOR
LOCATIONS SEE
FLOOR PLAN DRAWINGS FURNISHED
WITH EQUIPMENT.
Fig. 31
Securely Anchor the Controller