Preparation 1 - Turning Power ON 29
Preparation 1 - Turning Power ON
Turning power ON
1
Open the power switch cover, and then press the power switch to
“
” (ON) side.
The equipment starts warming itself up. The warm-up time takes approx. 25 seconds.
When the warm-up has finished, the [START] lamp is lit to show that the equipment is
ready for copying.
If you place an original and press the [START] button during the warm-up, copying auto-
matically starts when the warm-up has finished (= auto job start). The [START] lamp
keeps blinking from when you press the [START] button to when the warm-up finishes.
2
Key in the access code if the equipment is managed under the
access code function.
Key in the 3-digit access code, and then press the [START] button. Then the equipment
is ready for copying.
y
If the access code function is enabled, press the [FUNCTION CLEAR] button after
any operation has been finished to prevent unauthorized use of the equipment.
y
For the details of the access code setting, ask your service technician.
Turning power OFF
Open the power switch cover, and then press the power switch to “
” (OFF) side.
Summary of Contents for e-studio 166
Page 1: ...MULTIFUNCTIONAL DIGITAL SYSTEMS Operator s Manual for Copying Functions ...
Page 2: ......
Page 12: ...10 CONTENTS ...
Page 60: ......
Page 74: ......
Page 78: ......
Page 100: ......
Page 106: ......
Page 112: ......
Page 115: ...DP 1660 2060 OME06015700 ...