
Page
36
1
2
3
4
5
6
STEP
30
NOTE: The cable routing for each SWIVEL
PULLEY CABLE (53) is the same on both
sides of the machine.
Disassemble the two BOLTS from one of the
FAST ATTACH
TM
CABLE COUPLERS of the
SWIVEL PULLEY CABLE (53) as shown in the
inset.
Remove the ball end of the CABLE from the
COUPLER CORE and HOUSING. The CABLE
COUPLER will be re-assembled in a later step.
Route the ball end of SWIVEL PULLEY CABLE
(53) thru the TOP FRAME SUPPORT (21),over
the PULLEY in the FRONT UPRIGHT (20) and
around the two PULLEYS in the BASE (19).
Loop the SWIVEL PULLEY CABLE (53) around
the 3-1/2” THREADED FLOATING PULLEY
(27) as shown.
Make sure the cable runs in the groove of the
pulleys.
BOLT
ROLLER
PIN
COUPLER
CORE
SLIDE
HOUSING
SPRING
27
53
21
20
19
NOTE:
CABLE must run
behind BOLTS!
NOTE: PULLEY will
need to be removed.
Summary of Contents for tq9
Page 46: ...Page 46...
Page 48: ...Page 48...