
Page
12
1
2
3
4
5
6
STEP
6
SECURELY
assemble
the
KNEE
HOLD
DOWN
(
13
)
to
the
FRONT
UPRIGHT
(
20
)
using
:
One
KNEE
HOLD
DOWN
ADJ
PLATE
(
14
)
One 3/8 X 1” BOLT (41)
Two 3/8 X 3/4” BOLTS (35)
Four
3
/
8
”
FLAT
WASHERS
(
30
)
One
3
/
8
”
LOCK
NUT
(
34
)
(NOTE: Pull back on the KNEE HOLD
DOWN POP PIN and check to make sure the
POP PIN shaft engages in the KNEE HOLD
DOWN ADJUST PLATE)
34
14
3
/
8
X
1
”
41
13
30
20
POP
PIN
3
/
8
X
3/4
”
35
Summary of Contents for tq9
Page 46: ...Page 46...
Page 48: ...Page 48...