5
C
. For all engine bay service requiring the
removal of the cargo bed, adhere to the
previous removal procedures in Maintenance
Safety Instructions on Page 2.
D
. Refer to Workman
®
Operators Manual for
service instructions.
2
. Installation of welding gas bottles (for units
equipped with optional Acetylene Tray Kit Model
07224).
See page 9 for SET-UP instructions
of Acetylene Tray Kit.
A.
Remove cover plate from industrial bed.
B
. Remove fasteners securing the Bottle
Restraint Plate at the front left corner of the
cargo bed and set plate aside.
C
. Place Oxygen and Acetylene Bottles onto
the Bottle Tray as shown in Figure 5. Tray is
designed for a 38 High Acetylene Tank with
a diameter of 8 1/2 and a 48 high Oxygen
Tank with a diameter of 7 1/2.
D
. Secure the bottles to the bed with the bottle
restraint plate. Reinstall 1/2 Flange Lock
fasteners using a torque load of 75 ftlb
(102 Nm).
FIG.
5
1. Oxygen and Acetylene Bottles
2. Bottle Restraint plate
3. Optional Bottle Tray
MAINTENANCE
1
2
3
TORQUE SPECIFICATIONS
Bolt Size ftlb Nm
1/4
100 1125
Bolt Size inlb Ncm
3/8
1/2
30
75
41
102
Summary of Contents for Workman 07223-90001
Page 12: ...12...