Checking the Engine-Oil Level
Before you start the engine and use the machine, check
the oil level in the engine crankcase; refer to
Engine-Oil Level (page 31)
.
Breaking in a New Machine
New engines take time to develop full power. Mower decks
and drive systems have higher friction when new, placing
additional load on the engine. Allow 40 to 50 hours of
break-in time for new machines to develop full power and
best performance.
Operating the Parking Brake
Always set the parking brake when you stop the machine or
leave it unattended.
Setting the Parking Brake
B
A
g027638
Figure 10
Releasing the Parking Brake
B
A
g027639
Figure 11
Operating the Throttle
The throttle control can be moved between the S
LOW
and
F
AST
positions (
Always use the F
AST
position when turning on the mower
deck with the blade-control switch (PTO).
g028222
Figure 12
Operating the Choke
Use the choke to start a cold engine.
1.
If the engine is cold, use the choke to start the engine.
2.
Pull up on the choke knob to engage the choke before
using the ignition switch (
).
3.
Push down on the choke to disengage the choke after
the engine starts (
).
G008959
1
2
Figure 13
1.
O
N
position
2.
O
FF
position
18
Summary of Contents for TITAN 74891
Page 52: ...Schematics Wire Diagram Rev A 52...
Page 53: ...Notes 53...
Page 54: ...Notes 54...
Page 55: ...Notes 55...