3.
Adjust the control tower forward or backward by
sliding the tower on the center frame tube and
tightening the flange nuts and U-bolts.
Important:
Position the tower in a
comfortable position for the operator, within
reach. The tower will pitch forward when
crossing a ditch or low area in turf.
4.
Route the supply and return hoses through the
hose hanger (
g012755
Figure 6
1.
Supply and return hoses
2.
Hose hanger
4
Mounting the Control
Linkage and Levers
Parts needed for this procedure:
3
Control levers with knobs
3
Hex nut
3
Clevis pin (5/16 x 1-1/4 inch)
6
Cotter pin (5/32 x 3/4 inch)
Procedure
1.
Remove the control-panel cover from the control
tower by removing the 4 capscrews (
2.
Secure the upper control linkage tubes to the
pivot blocks with the clevis pins and cotter pins
(
).
3.
Coat the clevis pins with No. 2 lithium grease.
g316644
Figure 7
1.
Upper control linkage tube
4.
Cotter pin
2.
Clevis pin
5.
Control lever connection
hole
3.
Pivot block
4.
Install the control-panel cover to the control
tower with the 4 corresponding capscrews
(
).
g316580
Figure 8
1.
Control-panel cover
3.
Capscrews
2.
Control levers
5.
Screw the control levers into the pivot blocks
(
and
).
6.
Ensure that the valve-spool levers (
) are
in neutral (middle position) by pivoting the levers
9