![Toro Recycler II ProLine 21 Operator'S Manual Download Page 6](http://html.mh-extra.com/html/toro/recycler-ii-proline-21/recycler-ii-proline-21_operators-manual_1132146006.webp)
Figures – Figuras
iv
m–3662
1
2
English
1.
Primer
2.
Spark plug wire
Español
1.
Cebador
2.
Cable de la bujia
m-3769
m–261
1
3
2
English
1.
Bag frame on retaining
post
2.
Pin engaged in catch
3.
Handle fully forward.
Discharge door closed.
Español
1.
Marco del saco en el
poste retenedor
2.
Pasador en el enganche
3.
Manija completamente
hacia adelante. Puerta de
descarga cerrada
m–260
1
English
1.
Pin locked in bag notch
Español
1.
Pasador trabado en la ranura del saco
12
13
14
15