Assembly
14
DESCRIPTION
USE
QTY.
Fuel tank
Bolt 5/16–1/ x 7/8” (22.5 mm)
Lock washer 5/16”
Washer 5/16”
Stud
Spring
Hose clamp
1
2
2
4
2
2
1
Install fuel tank
Operator’s Manual
Engine Operator’s Manual
Parts Catalog
Registration card
1
1
1
1
Read before operating machine
Fill out and return to Toro
Install Front Castors
1.
Align castors with holes on top and front of
mower and insert (8) 3/8–16 x 3/4” (19 mm)
bolts through mower. Secure with (8) 3/8–16
flange nuts below mower (Fig. 1).
Note:
Tighten lower bolts first to pull castor
against front, then top bolts last.
2.
Torque bolts to 30–35 ft. lb. (40–47 N
m).
m–3777
Figure 1
1.
Front castor
2.
Bolt 3/8–16 x 3/4” (19 mm)
3.
Flange nut 3/8–16
Install Upper Handle
1.
Position handle outside frame and align upper
handle mounting holes with desired mounting
holes in rear frame. High, medium or low
according to operators height (Fig. 2).
2.
Secure each side with (2) 3/8–16 x 1” (26mm)
bolts and (2) 3/8–16 locknuts (Fig. 2).
3.
Torque bolts to 25 ft. lbs. (34 N
m).
m–4213
Figure 2
1.
Upper handle
2.
Rear frame
3.
Bolt 3/8–16 x 1” (26mm)
4.
Locknut 3/8
5.
Low
6.
High
Summary of Contents for ProLine 14 HP
Page 9: ...Safety 7 Slope Chart Read all safety instructions on pages 2 9 ...
Page 10: ...8 ...
Page 12: ...Safety 10 99 3943 ...
Page 45: ...Maintenance 43 Wiring Diagram ...
Page 49: ......
Page 50: ......
Page 51: ......